Artarmon EV Charger Installation, Done Properly
A proper home charging setup starts at the switchboard, not the wall socket. The charger runs off its own correctly-sized circuit, and some houses need the incoming supply checked before that circuit can exist.
We install home EV chargers across Artarmon to AS/NZS 3000, with a fixed written quote before anything is switched off. Call (02) 9139 8011.
Fast Response / Often same or next day, quotes included, so your charger isn't a long wait away.
Premium Charger Brands / Clipsal and Hager gear fitted as standard, not cheap imports.
Lifetime Workmanship Guarantee / If the install isn't right, we come back and fix it at no cost.
Certificate of Compliance / Testing and formal sign-off finish every charger job.
Signs You Need EV Charger Installation
A few situations mean it's time to book a proper install rather than trickle-charging through a household socket.
- Charging from a regular GPO and finding it painfully slow
- An EV arriving soon and no decent way to charge it where you park
- An older switchboard that hasn't been checked for extra load capacity
- A garage or carport with no power point anywhere near the parking spot
- Wanting a smart charger with scheduling or app control, not just a socket
- Strata or a shared driveway that needs the install planned around access
Any of these is worth a call before you're stuck charging off an extension lead, which isn't a safe long-term solution for a car battery and isn't what it's rated for anyway.

Inside a Typical EV Charger Installation Job
Circuit assessment. Checking the switchboard's spare capacity and whether the existing supply can take the extra load.
Dedicated circuit. The charger gets its own run of cable and its own RCD protection, shared with nothing.
Charger mounting and wiring. We fix the unit where you want it, cable it in and bring it live.
Supply upgrade, where needed. Some older boards need extra capacity added before a charger can go on safely.
Testing and sign-off. Full testing before we hand it over, plus a walk-through of how the charger works.
Smart-charger setup. If your model has an app, we pair it and prove the scheduling works before handover.

EV Charger Installation in Artarmon Homes
Affluent professional households across Artarmon are increasingly asking for home EV chargers and the supply upgrades that go with them.
It tracks with what we're seeing on the ground. Streets like Barton Road, close to the station and the Chatswood border, have a strong mix of professional households adding a second car and a charger at the same time.
The supply question matters more here than the charger itself. Getting that assessed properly before the quote is what stops a job blowing out mid-install.
Homes with a single-phase supply and a full board of existing circuits are the ones most likely to need extra work ahead of the charger itself. We'll tell you upfront if that's the case for your place, not after the wall's been opened up, so there's no mid-job scramble to source parts.

What Affects the Cost of EV Charger Installation
A few things move the price from a simple job to a bigger one.
- The cable run: a board near the garage is a short job, a far corner isn't
- Spare capacity in the current supply, or the lack of it
- Which charger you've picked, basic socket or smart unit
- Access for cable runs, particularly through brick or rendered walls
- Switchboard defects that only surface once we're inside the board
Artarmon's mix of demand means we're assessing supply capacity on more of these jobs than a straightforward install elsewhere. That capacity check is quoted up front, not discovered once the charger's already on the wall.
You get a free written quote confirmed before we touch the board.

The Rules That Apply in NSW
EV charger installation counts as notifiable electrical work, so a Certificate of Compliance for electrical work follows testing and completion.
DIY electrical work is illegal in NSW, which rules out anything beyond plugging into an existing standard power point.
The standards treat individual RCD protection on the charger's circuit as a given, not an upgrade option. Some charger models also need a Type B RCD specifically, which we'll confirm against the unit you've chosen.
Should the incoming supply need upgrading, that's assessed and quoted within the same job, with the paperwork covering both pieces of work together.
Anything beyond your meter, on the network side of the connection, sits outside an electrician's normal scope and belongs to the local distributor instead.

What You Get When We Do Your EV Charger Installation
Every install gets Clipsal and Hager gear built to handle the load, not budget parts that struggle under it.
Every install we do is backed by a lifetime workmanship guarantee. If something isn't right after we've left, we come back and fix it at no cost to you.
We protect the work area before starting, and clean up properly once the charger's on the wall and tested.

The Process, and What It Typically Takes
- Assess the supply. We check switchboard capacity and confirm whether an upgrade is needed.
- Quote and confirm. Cabling, charger and any supply work all land in a single fixed written quote.
- Install and connect. The dedicated circuit and charger go in, wired and mounted properly.
- Test and hand over. Everything is tested, the paperwork is lodged, and we walk you through the charger.
A straightforward install without a supply upgrade is usually done in a day. Add a supply upgrade and it can run longer, which we'll flag at the quote stage rather than partway through the job.

Related Work and Surrounding Areas
EV charger installation is frequently booked alongside a switchboard upgrade, since the two jobs often need doing together on older boards. Light installation for the garage or carport is another common add-on while we're already on site.
St Leonards, Naremburn, Lane Cove, Willoughby and Chatswood are all part of our regular patch alongside Artarmon. Same fixed-price approach and the same crew, wherever the job lands.

Book Your EV Charger Installation Today
Get your home ready before the car arrives. Call (02) 9139 8011 for a free written quote, often same or next day.
Common questions
Common EV Charger Installation FAQs
The questions Artarmon owners raise most often ahead of a charger job.
Do I need a licensed electrician for ev charger installation?
Yes. It's a dedicated circuit off your switchboard, which by law has to be done by a licensed electrician, not a general handyman.
Will the power be off the whole time during ev charger installation?
There's a short outage while the fresh circuit is tied into the board, and that's it. Power is back on well before we pack up.
Does ev charger installation involve any notification paperwork in NSW?
Yes, it's notifiable electrical work, so a Certificate of Compliance is lodged once the charger is installed and tested.
Can I supply my own gear, or do you bring the materials?
Either works. Bring your own charger and we'll install it, or we can supply and fit premium gear, priced into the quote.
Do you offer ev charger installation in Artarmon on weekends?
Yes. Say Saturday suits you best and we'll lock in a time.
How do I prepare for the job?
Clear access to the switchboard helps, and it's worth picking a rough spot for the charger, ideally near where the car parks. Everything else is ours to sort on the day.